Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
16 works
₹2.05 Cr sanctioned
₹1.57 Cr spent (77%)
02
Works for Flood Control and Protection
9 works
₹1.48 Cr sanctioned
₹1.18 Cr spent (80%)
03
Terracing
5 works
₹74.46 L sanctioned
₹62.85 L spent (84%)
04
Construction of Check Dam/Stop Dam
5 works
₹68.68 L sanctioned
₹63.88 L spent (93%)
05
Rural Housing
239 works
₹48.91 L sanctioned
₹42.71 L spent (87%)
06
Cattle Shed
14 works
₹48.25 L sanctioned
₹42.50 L spent (88%)
07
Construction of Road and Culvert
12 works
₹47.00 L sanctioned
₹40.32 L spent (86%)
08
Repair & maint of Water Harvesting Structures
4 works
₹32.22 L sanctioned
₹24.20 L spent (75%)
09
Construction of Bund
2 works
₹29.74 L sanctioned
₹29.33 L spent (99%)
10
Repair & maint of Percolation Tank
3 works
₹29.57 L sanctioned
₹27.13 L spent (92%)