Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
14 works
₹2.09 Cr sanctioned
₹1.85 Cr spent (88%)
02
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
7 works
₹1.03 Cr sanctioned
₹95.72 L spent (93%)
03
Construction of Percolation Tank
6 works
₹98.85 L sanctioned
₹87.00 L spent (88%)
04
Works for Flood Control and Protection
10 works
₹84.49 L sanctioned
₹65.71 L spent (78%)
05
Construction of Check Dam/Stop Dam
9 works
₹80.23 L sanctioned
₹70.26 L spent (88%)
06
Construction of Road and Culvert
9 works
₹65.62 L sanctioned
₹57.69 L spent (88%)
07
Construction of Trench
5 works
₹64.40 L sanctioned
₹60.56 L spent (94%)
08
Farm Pond
21 works
₹59.90 L sanctioned
₹51.33 L spent (86%)
09
Terracing
3 works
₹54.32 L sanctioned
₹51.79 L spent (95%)
10
Repair & maint of Road
2 works
₹52.40 L sanctioned
₹49.69 L spent (95%)