Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
38 works
₹4.40 Cr sanctioned
₹3.91 Cr spent (89%)
02
Construction of Road and Culvert
22 works
₹1.97 Cr sanctioned
₹1.51 Cr spent (77%)
03
Plantation
13 works
₹97.71 L sanctioned
₹77.83 L spent (80%)
04
Construction of Check Dam/Stop Dam
6 works
₹39.38 L sanctioned
₹37.86 L spent (96%)
05
Constr of Cement Concrete Roads
12 works
₹36.09 L sanctioned
₹23.45 L spent (65%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
1 works
₹14.96 L sanctioned
₹14.86 L spent (99%)
07
Construction of Crematorium
6 works
₹11.80 L sanctioned
₹11.29 L spent (96%)
08
Construction of Percolation Tank
1 works
₹10.85 L sanctioned
₹7.92 L spent (73%)
09
Cattle Shed
12 works
₹9.08 L sanctioned
₹6.60 L spent (73%)
10
Rural Housing
43 works
₹6.58 L sanctioned
₹6.34 L spent (96%)