Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Repair & maint of Pond/ Tank
15 works
₹1.87 Cr sanctioned
₹1.78 Cr spent (95%)
02
Construction of Road and Culvert
12 works
₹1.72 Cr sanctioned
₹1.51 Cr spent (88%)
03
Works for Flood Control and Protection
13 works
₹1.46 Cr sanctioned
₹1.30 Cr spent (89%)
04
Construction of Check Dam/Stop Dam
10 works
₹1.22 Cr sanctioned
₹1.18 Cr spent (97%)
05
Construction of Tank
10 works
₹1.14 Cr sanctioned
₹1.06 Cr spent (93%)
06
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹74.60 L sanctioned
₹72.72 L spent (97%)
07
Cattle Shed
3 works
₹46.58 L sanctioned
₹42.24 L spent (91%)
08
Construction of Percolation Tank
4 works
₹43.91 L sanctioned
₹41.81 L spent (95%)
09
Construction of Trench
8 works
₹42.79 L sanctioned
₹29.37 L spent (69%)
10
Construction of Bund
2 works
₹23.86 L sanctioned
₹22.14 L spent (93%)