Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
32 works
₹4.09 Cr sanctioned
₹3.77 Cr spent (92%)
02
Construction of Road and Culvert
17 works
₹2.52 Cr sanctioned
₹2.20 Cr spent (87%)
03
Construction of Embankment
9 works
₹1.20 Cr sanctioned
₹1.15 Cr spent (96%)
04
Farm Pond
15 works
₹71.67 L sanctioned
₹35.53 L spent (50%)
05
Cattle Shed
23 works
₹18.36 L sanctioned
₹16.17 L spent (88%)
06
Construction of Check Dam/Stop Dam
4 works
₹14.29 L sanctioned
₹12.54 L spent (88%)
07
Strengthening of Embankment
1 works
₹14.04 L sanctioned
₹10.79 L spent (77%)
08
Plantation
6 works
₹11.06 L sanctioned
₹4.78 L spent (43%)
09
Construction of NADEP/Vermi Compost Pit
4 works
₹6.48 L sanctioned
₹5.11 L spent (79%)
10
Constr of Cement Concrete Roads
6 works
₹5.26 L sanctioned
₹3.75 L spent (71%)