Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Trench
11 works
₹1.48 Cr sanctioned
₹1.32 Cr spent (90%)
02
Construction of Check Dam/Stop Dam
8 works
₹1.39 Cr sanctioned
₹1.16 Cr spent (83%)
03
Repair & maint of Pond/ Tank
8 works
₹60.58 L sanctioned
₹52.89 L spent (87%)
04
Construction of Tank
4 works
₹58.52 L sanctioned
₹54.48 L spent (93%)
05
Construction of Road and Culvert
3 works
₹53.30 L sanctioned
₹53.84 L spent (101%)
06
Farm Pond
11 works
₹43.97 L sanctioned
₹32.65 L spent (74%)
07
Construction of Percolation Tank
2 works
₹27.80 L sanctioned
₹25.95 L spent (93%)
08
Cattle Shed
1 works
₹27.72 L sanctioned
₹24.34 L spent (88%)
09
Construction of Bund
2 works
₹22.10 L sanctioned
₹20.07 L spent (91%)
10
Terracing
2 works
₹21.03 L sanctioned
₹15.67 L spent (75%)