Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Works for Flood Control and Protection
35 works
₹3.42 Cr sanctioned
₹3.03 Cr spent (89%)
02
Construction of Check Dam/Stop Dam
28 works
₹2.73 Cr sanctioned
₹2.73 Cr spent (100%)
03
Construction of Road and Culvert
36 works
₹1.16 Cr sanctioned
₹1.41 Cr spent (122%)
04
Repair & maint of Road
2 works
₹99.89 L sanctioned
₹98.48 L spent (99%)
05
Repair & Maint of Check Dam/Stop Dam
8 works
₹97.76 L sanctioned
₹92.12 L spent (94%)
06
Deepening / Desilting of Flood Channels
11 works
₹72.27 L sanctioned
₹56.15 L spent (78%)
07
Construction of Well
46 works
₹35.72 L sanctioned
₹35.08 L spent (98%)
08
Repair & maint of Water Harvesting Structures
4 works
₹34.89 L sanctioned
₹25.29 L spent (72%)
09
Cattle Shed
39 works
₹32.80 L sanctioned
₹31.61 L spent (96%)
10
Plantation
7 works
₹32.04 L sanctioned
₹29.24 L spent (91%)