Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
29 works
₹3.79 Cr sanctioned
₹3.63 Cr spent (96%)
02
Construction of Check Dam/Stop Dam
26 works
₹2.78 Cr sanctioned
₹2.70 Cr spent (97%)
03
Works for Flood Control and Protection
9 works
₹1.31 Cr sanctioned
₹1.15 Cr spent (88%)
04
Construction of Spur
5 works
₹92.94 L sanctioned
₹81.19 L spent (87%)
05
Construction of Road and Culvert
14 works
₹79.21 L sanctioned
₹61.16 L spent (77%)
06
Boulder Check/Gully Plug
6 works
₹78.51 L sanctioned
₹75.91 L spent (97%)
07
Plantation
8 works
₹55.27 L sanctioned
₹41.37 L spent (75%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹41.19 L sanctioned
₹36.65 L spent (89%)
09
Constr of Food Grain storage
1 works
₹37.85 L sanctioned
₹37.78 L spent (100%)
10
Construction of Trench
2 works
₹28.59 L sanctioned
₹28.44 L spent (99%)