Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
19 works
₹1.78 Cr sanctioned
₹1.45 Cr spent (81%)
02
Construction of Check Dam/Stop Dam
34 works
₹1.72 Cr sanctioned
₹1.46 Cr spent (85%)
03
Construction of Percolation Tank
14 works
₹1.31 Cr sanctioned
₹1.21 Cr spent (92%)
04
Construction of Tank
8 works
₹64.60 L sanctioned
₹61.57 L spent (95%)
05
Repair & maint of Pond/ Tank
7 works
₹58.91 L sanctioned
₹54.06 L spent (92%)
06
Construction of Trench
6 works
₹52.98 L sanctioned
₹32.07 L spent (61%)
07
Constr of Cement Concrete Roads
24 works
₹47.94 L sanctioned
₹35.12 L spent (73%)
08
Renovation of traditional water bodies
2 works
₹43.65 L sanctioned
₹34.06 L spent (78%)
09
Repair & maint of Water Harvesting Structures
97 works
₹37.86 L sanctioned
₹31.35 L spent (83%)
10
Rural Housing
188 works
₹30.23 L sanctioned
₹29.38 L spent (97%)