Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
17 works
₹2.33 Cr sanctioned
₹1.91 Cr spent (82%)
02
Construction of Check Dam/Stop Dam
32 works
₹1.71 Cr sanctioned
₹1.40 Cr spent (82%)
03
Construction of Percolation Tank
13 works
₹1.51 Cr sanctioned
₹1.38 Cr spent (91%)
04
Repair & Maint of Check Dam/Stop Dam
5 works
₹46.15 L sanctioned
₹43.91 L spent (95%)
05
Culvert
5 works
₹44.71 L sanctioned
₹42.99 L spent (96%)
06
Repair & maint of Pond/ Tank
8 works
₹36.43 L sanctioned
₹30.39 L spent (83%)
07
Construction of Tank
5 works
₹35.02 L sanctioned
₹35.62 L spent (102%)
08
Constr of Cement Concrete Roads
19 works
₹34.45 L sanctioned
₹16.13 L spent (47%)
09
Renovation of traditional water bodies
1 works
₹33.97 L sanctioned
₹10.30 L spent (30%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
3 works
₹33.18 L sanctioned
₹30.78 L spent (93%)