Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Well
32 works
₹14.43 Cr sanctioned
₹46.90 L spent (3%)
02
Farm Pond
105 works
₹13.32 Cr sanctioned
₹35.52 L spent (3%)
03
Land Development
130 works
₹2.55 Cr sanctioned
₹2.17 Cr spent (85%)
04
Construction of Road and Culvert
13 works
₹61.24 L sanctioned
₹39.09 L spent (64%)
05
Construction of Check Dam/Stop Dam
25 works
₹57.17 L sanctioned
₹47.91 L spent (84%)
06
Construction of Trench
12 works
₹51.52 L sanctioned
₹41.82 L spent (81%)
07
Rural Housing
277 works
₹49.59 L sanctioned
₹46.77 L spent (94%)
08
Plantation
17 works
₹47.11 L sanctioned
₹35.77 L spent (76%)
09
Repair & maint of Percolation Tank
2 works
₹28.01 L sanctioned
₹24.53 L spent (88%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
2 works
₹22.19 L sanctioned
₹14.83 L spent (67%)