Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Plantation
94 works
₹2.40 Cr sanctioned
₹55.86 L spent (23%)
02
Farm Pond
249 works
₹1.85 Cr sanctioned
₹1.74 Cr spent (94%)
03
Construction of Trench
10 works
₹1.74 Cr sanctioned
₹32.84 L spent (19%)
04
Construction of Check Dam/Stop Dam
27 works
₹1.40 Cr sanctioned
₹1.06 Cr spent (76%)
05
Construction of Bund
75 works
₹1.20 Cr sanctioned
₹1.07 Cr spent (89%)
06
Construction of NADEP/Vermi Compost Pit
40 works
₹70.87 L sanctioned
₹67.06 L spent (95%)
07
Rural Housing
289 works
₹53.28 L sanctioned
₹51.04 L spent (96%)
08
Construction of Road and Culvert
9 works
₹42.74 L sanctioned
₹27.08 L spent (63%)
09
Works for Flood Control and Protection
9 works
₹32.71 L sanctioned
₹26.89 L spent (82%)
10
Construction of Well
24 works
₹32.59 L sanctioned
₹31.01 L spent (95%)