Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
196 works
₹17.67 Cr sanctioned
₹80.59 L spent (5%)
02
Deepening / Desilting of Flood Channels
2 works
₹4.52 Cr sanctioned
₹16.65 L spent (4%)
03
Farm Pond
82 works
₹1.53 Cr sanctioned
₹1.13 Cr spent (74%)
04
Construction of Bund
98 works
₹85.57 L sanctioned
₹65.86 L spent (77%)
05
Land Development
78 works
₹76.28 L sanctioned
₹60.64 L spent (80%)
06
Rural Housing
266 works
₹47.15 L sanctioned
₹44.55 L spent (94%)
07
Construction of Trench
8 works
₹38.62 L sanctioned
₹31.54 L spent (82%)
08
Repair & maint of Pond/ Tank
5 works
₹31.90 L sanctioned
₹24.08 L spent (75%)
09
Construction of Well
7 works
₹24.62 L sanctioned
₹17.99 L spent (73%)
10
Construction of Road and Culvert
4 works
₹22.76 L sanctioned
₹23.78 L spent (104%)