Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
201 works
₹16.57 Cr sanctioned
₹59.89 L spent (4%)
02
Farm Pond
89 works
₹1.84 Cr sanctioned
₹1.48 Cr spent (80%)
03
Construction of Bund
131 works
₹1.20 Cr sanctioned
₹97.11 L spent (81%)
04
Rural Housing
329 works
₹61.37 L sanctioned
₹59.60 L spent (97%)
05
Construction of Well
22 works
₹46.94 L sanctioned
₹37.30 L spent (79%)
06
Construction of Trench
69 works
₹38.85 L sanctioned
₹23.66 L spent (61%)
07
Construction of Percolation Tank
3 works
₹34.38 L sanctioned
₹24.04 L spent (70%)
08
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
4 works
₹23.48 L sanctioned
₹13.61 L spent (58%)
09
Repair & maint of Pond/ Tank
5 works
₹22.68 L sanctioned
₹6.74 L spent (30%)
10
Land Development
27 works
₹22.65 L sanctioned
₹19.78 L spent (87%)