Showcase — Completed Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Road and Culvert
15 works
₹1.73 Cr sanctioned
₹94.13 L spent (54%)
02
Construction of Check Dam/Stop Dam
6 works
₹73.92 L sanctioned
₹79.62 L spent (108%)
03
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
10 works
₹65.96 L sanctioned
₹50.43 L spent (76%)
04
Plantation
22 works
₹48.77 L sanctioned
₹7.45 L spent (15%)
05
Rural Housing
288 works
₹47.21 L sanctioned
₹45.81 L spent (97%)
06
Repair & maint of Pond/ Tank
6 works
₹42.89 L sanctioned
₹32.25 L spent (75%)
07
Construction of Percolation Tank
4 works
₹38.71 L sanctioned
₹19.75 L spent (51%)
08
Land Development
29 works
₹36.77 L sanctioned
₹21.06 L spent (57%)
09
Construction of Trench
5 works
₹28.26 L sanctioned
₹22.96 L spent (81%)
10
Cattle Shed
22 works
₹20.90 L sanctioned
₹19.63 L spent (94%)