Showcase — Completed Works
Rollup last refreshed: 2026-08-04 08:29:21.124578
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
152 works
₹2.54 Cr sanctioned
₹1.91 Cr spent (75%)
02
Construction of Road and Culvert
20 works
₹1.10 Cr sanctioned
₹81.34 L spent (74%)
03
Farm Pond
107 works
₹98.08 L sanctioned
₹83.16 L spent (85%)
04
Construction of Bund
77 works
₹70.12 L sanctioned
₹58.56 L spent (84%)
05
Rural Housing
277 works
₹48.13 L sanctioned
₹47.96 L spent (100%)
06
Boulder Check/Gully Plug
10 works
₹40.88 L sanctioned
₹37.94 L spent (93%)
07
Plantation
14 works
₹39.20 L sanctioned
₹11.44 L spent (29%)
08
Construction of Trench
13 works
₹38.75 L sanctioned
₹33.43 L spent (86%)
09
Repair & maint of Water Harvesting Structures
3 works
₹26.36 L sanctioned
₹24.87 L spent (94%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
5 works
₹25.08 L sanctioned
₹23.21 L spent (93%)