Monitor — Ongoing Works
Rollup last refreshed: 2026-07-11 02:05:34.314168
Works ongoing
7,170
Sanctioned (pure scheme)
₹687.93 Cr
Expenditure since inception
₹389.11 Cr
Balance cost (unspent)
₹298.82 Cr
Wage ₹193.03 Cr · Material ₹105.79 Cr
Expenditure trend
Slowest spending this month — worth a look
- KHANDWA — PANDHANA−₹80.86 L
- KHANDWA — KHANDWA−₹50.87 L
- SEONI — DHANAURA−₹37.90 L
Mandays trend
Lowest mandays this month — worth a look
- DHAR — KUKSHI-17,658
- DHAR — TIRLA-7,398
- JHABUA — THANDLA-4,753
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Tank
1,652 works
₹244.06 Cr sanctioned
₹143.18 Cr spent (59%)
02
Construction of Bund
1,284 works
₹174.26 Cr sanctioned
₹102.23 Cr spent (59%)
03
Plantation
1,148 works
₹50.44 Cr sanctioned
₹16.01 Cr spent (32%)
04
Works for Flood Control and Protection
380 works
₹47.10 Cr sanctioned
₹27.73 Cr spent (59%)
05
Construction of Check Dam/Stop Dam
266 works
₹37.08 Cr sanctioned
₹20.85 Cr spent (56%)
06
Construction of Road and Culvert
188 works
₹32.24 Cr sanctioned
₹21.63 Cr spent (67%)
07
Farm Pond
473 works
₹16.42 Cr sanctioned
₹6.84 Cr spent (42%)
08
Land Development
110 works
₹13.25 Cr sanctioned
₹7.45 Cr spent (56%)
09
Constr of Cement Concrete Roads
211 works
₹11.21 Cr sanctioned
₹8.52 Cr spent (76%)
10
Construction of Percolation Tank
42 works
₹6.34 Cr sanctioned
₹3.55 Cr spent (56%)