Monitor — Ongoing Works
Rollup last refreshed: 2026-08-03 08:07:30.505148
Works ongoing
67
Sanctioned (pure scheme)
₹72.02 L
Expenditure since inception
₹37.51 L
Balance cost (unspent)
₹34.51 L
Wage ₹23.57 L · Material ₹10.94 L
Expenditure trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
Slowest spending this week — worth a look
Mandays trend
01-Jun
08-Jun
15-Jun
22-Jun
29-Jun
06-Jul
13-Jul
20-Jul
27-Jul
03-Aug
Lowest mandays this week — worth a look
Top new work types
Top 10 · ranked by sanction cost (Admin Config)
01
Construction of Check Dam/Stop Dam
1 works
₹14.96 L sanctioned
₹11.52 L spent (77%)
02
Construction of Tank
1 works
₹14.84 L sanctioned
₹19,836 spent (1%)
03
Rural Housing
58 works
₹13.62 L sanctioned
₹10.49 L spent (77%)
04
Farm Pond
3 works
₹13.53 L sanctioned
₹3.60 L spent (27%)
05
Plantation
2 works
₹7.26 L sanctioned
₹4.16 L spent (57%)
06
Construction of Road and Culvert
1 works
₹7.15 L sanctioned
₹6.95 L spent (97%)
07
Constr of Cement Concrete Roads
1 works
₹65,000 sanctioned
₹60,224 spent (93%)
08
Construction of Toilets
0 works
₹0 sanctioned
₹0 spent (0%)
09
Construction of Trench
0 works
₹0 sanctioned
₹0 spent (0%)
10
Construction of Water Drain/Diversion Channel/Drainage/Field Channel
0 works
₹0 sanctioned
₹0 spent (0%)