Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Road and Culvert
48.5%
OF COST SPENT
₹20.05 Cr spent
of ₹41.30 Cr sanctioned
₹21.25 Cr still to spend
on 140 ongoing works
Works ongoing
140
Open the list of these works →
Sanctioned
₹41.30 Cr
Pure scheme (wage + material)
Expenditure since inception
₹20.05 Cr
48.5% of sanction
Balance cost (unspent)
₹21.25 Cr
Wage₹10.30 Cr
Material₹10.96 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore