Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
32.4%
OF COST SPENT
₹78.66 L spent
of ₹2.43 Cr sanctioned
₹1.64 Cr still to spend
on 55 ongoing works
Works ongoing
55
Open the list of these works →
Sanctioned
₹2.43 Cr
Pure scheme (wage + material)
Expenditure since inception
₹78.66 L
32.4% of sanction
Balance cost (unspent)
₹1.64 Cr
Wage₹94.70 L
Material₹69.68 L
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh