Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Road and Culvert
3.1%
OF COST SPENT
₹4.58 L spent
of ₹1.46 Cr sanctioned
₹1.41 Cr still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹1.46 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.58 L
3.1% of sanction
Balance cost (unspent)
₹1.41 Cr
Wage₹79.23 L
Material₹62.11 L
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh