Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGWorks for Flood Control and Protection
15.2%
OF COST SPENT
₹47,736 spent
of ₹3.15 L sanctioned
₹2.67 L still to spend
on 1 ongoing works
Works ongoing
1
Open the list of these works →
Sanctioned
₹3.15 L
Pure scheme (wage + material)
Expenditure since inception
₹47,736
15.2% of sanction
Balance cost (unspent)
₹2.67 L
Wage₹2.14 L
Material₹53,441