Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
77.2%
OF COST SPENT
₹7.20 L spent
of ₹9.33 L sanctioned
₹2.13 L still to spend
on 2 ongoing works
Works ongoing
2
Open the list of these works →
Sanctioned
₹9.33 L
Pure scheme (wage + material)
Expenditure since inception
₹7.20 L
77.2% of sanction
Balance cost (unspent)
₹2.13 L
Wage₹8,836
Material₹2.04 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh