Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.4%
OF COST SPENT
₹1.17 L spent
of ₹2.90 Cr sanctioned
₹2.89 Cr still to spend
on 70 ongoing works
Works ongoing
70
Open the list of these works →
Sanctioned
₹2.90 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.17 L
0.4% of sanction
Balance cost (unspent)
₹2.89 Cr
Wage₹2.33 Cr
Material₹55.63 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh