Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
2.7%
OF COST SPENT
₹10.39 L spent
of ₹3.79 Cr sanctioned
₹3.69 Cr still to spend
on 40 ongoing works
Works ongoing
40
Open the list of these works →
Sanctioned
₹3.79 Cr
Pure scheme (wage + material)
Expenditure since inception
₹10.39 L
2.7% of sanction
Balance cost (unspent)
₹3.69 Cr
Wage₹2.39 Cr
Material₹1.29 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore