Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
5.4%
OF COST SPENT
₹1.27 L spent
of ₹23.44 L sanctioned
₹22.18 L still to spend
on 7 ongoing works
Works ongoing
7
Open the list of these works →
Sanctioned
₹23.44 L
Pure scheme (wage + material)
Expenditure since inception
₹1.27 L
5.4% of sanction
Balance cost (unspent)
₹22.18 L
Wage₹14.55 L
Material₹7.63 L