Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
34.3%
OF COST SPENT
₹5.01 Cr spent
of ₹14.60 Cr sanctioned
₹9.59 Cr still to spend
on 148 ongoing works
Works ongoing
148
Open the list of these works →
Sanctioned
₹14.60 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.01 Cr
34.3% of sanction
Balance cost (unspent)
₹9.59 Cr
Wage₹7.06 Cr
Material₹2.53 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore