Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
1%
OF COST SPENT
₹3.29 L spent
of ₹3.35 Cr sanctioned
₹3.32 Cr still to spend
on 69 ongoing works
Works ongoing
69
Open the list of these works →
Sanctioned
₹3.35 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.29 L
1% of sanction
Balance cost (unspent)
₹3.32 Cr
Wage₹1.54 Cr
Material₹1.78 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore