Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Well
44.4%
OF COST SPENT
₹41.98 Cr spent
of ₹94.54 Cr sanctioned
₹52.56 Cr still to spend
on 2,745 ongoing works
Works ongoing
2,745
Open the list of these works →
Sanctioned
₹94.54 Cr
Pure scheme (wage + material)
Expenditure since inception
₹41.98 Cr
44.4% of sanction
Balance cost (unspent)
₹52.56 Cr
Wage₹12.44 Cr
Material₹40.12 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block