Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstr of Gabion
21.6%
OF COST SPENT
₹14.62 L spent
of ₹67.66 L sanctioned
₹53.04 L still to spend
on 45 ongoing works
Works ongoing
45
Open the list of these works →
Sanctioned
₹67.66 L
Pure scheme (wage + material)
Expenditure since inception
₹14.62 L
21.6% of sanction
Balance cost (unspent)
₹53.04 L
Wage₹13.72 L
Material₹39.32 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Alirajpur — Jobat ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Lakh