Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Percolation Tank
74.2%
OF COST SPENT
₹6.26 Cr spent
of ₹8.45 Cr sanctioned
₹2.18 Cr still to spend
on 81 ongoing works
Works ongoing
81
Open the list of these works →
Sanctioned
₹8.45 Cr
Pure scheme (wage + material)
Expenditure since inception
₹6.26 Cr
74.2% of sanction
Balance cost (unspent)
₹2.18 Cr
Wage₹1.26 Cr
Material₹92.06 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore