Data as of 29 Oct 2026, 06:52 Admin login
FY
Reset

Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGWorks for Flood Control and Protection
0%
OF COST SPENT
₹0 spent
of ₹3.55 Cr sanctioned
₹3.55 Cr still to spend
on 31 ongoing works
Works ongoing
31
Open the list of these works →
Sanctioned
₹3.55 Cr
Pure scheme (wage + material)
Expenditure since inception
₹0
0% of sanction
Balance cost (unspent)
₹3.55 Cr
Wage₹1.37 Cr
Material₹2.18 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore