Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Tank
2%
OF COST SPENT
₹26.85 L spent
of ₹13.53 Cr sanctioned
₹13.26 Cr still to spend
on 113 ongoing works
Works ongoing
113
Open the list of these works →
Sanctioned
₹13.53 Cr
Pure scheme (wage + material)
Expenditure since inception
₹26.85 L
2% of sanction
Balance cost (unspent)
₹13.26 Cr
Wage₹8.82 Cr
Material₹4.45 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Crore