Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Well
0.6%
OF COST SPENT
₹13.66 L spent
of ₹23.31 Cr sanctioned
₹23.18 Cr still to spend
on 742 ongoing works
Works ongoing
742
Open the list of these works →
Sanctioned
₹23.31 Cr
Pure scheme (wage + material)
Expenditure since inception
₹13.66 L
0.6% of sanction
Balance cost (unspent)
₹23.18 Cr
Wage₹10.27 Cr
Material₹12.90 Cr
Trend · statewide

—
—
Slowest spending this fortnight · worth a look
Sidhi — Sihawal −₹1.36 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore