Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstr of GP Bhawan
3.1%
OF COST SPENT
₹7.47 L spent
of ₹2.38 Cr sanctioned
₹2.30 Cr still to spend
on 27 ongoing works
Works ongoing
27
Open the list of these works →
Sanctioned
₹2.38 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.47 L
3.1% of sanction
Balance cost (unspent)
₹2.30 Cr
Wage₹1.01 Cr
Material₹1.29 Cr