Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
31%
OF COST SPENT
₹3.72 Cr spent
of ₹12.01 Cr sanctioned
₹8.29 Cr still to spend
on 150 ongoing works
Works ongoing
150
Open the list of these works →
Sanctioned
₹12.01 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.72 Cr
31% of sanction
Balance cost (unspent)
₹8.29 Cr
Wage₹5.11 Cr
Material₹3.17 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore