Ongoing works in MGNREGA

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Tank
30.2%
OF COST SPENT
₹3.65 Cr spent
of ₹12.06 Cr sanctioned
₹8.41 Cr still to spend
on 151 ongoing works
Works ongoing
151
Open the list of these works →
Sanctioned
₹12.06 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.65 Cr
30.2% of sanction
Balance cost (unspent)
₹8.41 Cr
Wage₹5.23 Cr
Material₹3.18 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore