Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Check Dam/Stop Dam
30.6%
OF COST SPENT
₹38.32 L spent
of ₹1.25 Cr sanctioned
₹87.07 L still to spend
on 16 ongoing works
Works ongoing
16
Open the list of these works →
Sanctioned
₹1.25 Cr
Pure scheme (wage + material)
Expenditure since inception
₹38.32 L
30.6% of sanction
Balance cost (unspent)
₹87.07 L
Wage₹54.89 L
Material₹32.18 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh