Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Road and Culvert
74.8%
OF COST SPENT
₹2.13 Cr spent
of ₹2.85 Cr sanctioned
₹71.69 L still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹2.85 Cr
Pure scheme (wage + material)
Expenditure since inception
₹2.13 Cr
74.8% of sanction
Balance cost (unspent)
₹71.69 L
Wage₹27.60 L
Material₹44.10 L
Trend · statewide

—
—
Slowest spending this FY · worth a look
Dhar — Tirla −₹10.48 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore