Ongoing works in MGNREGA + VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMG
25%
OF COST SPENT
₹18.48 L spent
of ₹73.84 L sanctioned
₹55.35 L still to spend
on 13 ongoing works
Works ongoing
13
Open the list of these works →
Sanctioned
₹73.84 L
Pure scheme (wage + material)
Expenditure since inception
₹18.48 L
25% of sanction
Balance cost (unspent)
₹55.35 L
Wage₹26.56 L
Material₹28.79 L
Trend

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By district

Amounts in ₹ Lakh