Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
42.2%
OF COST SPENT
₹7.55 Cr spent
of ₹17.89 Cr sanctioned
₹10.34 Cr still to spend
on 643 ongoing works
Works ongoing
643
Open the list of these works →
Sanctioned
₹17.89 Cr
Pure scheme (wage + material)
Expenditure since inception
₹7.55 Cr
42.2% of sanction
Balance cost (unspent)
₹10.34 Cr
Wage₹3.00 Cr
Material₹7.35 Cr
Trend · statewide

—
—
Slowest spending this month · worth a look
Rewa — Gangev −₹69.63 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore