Ongoing works in VB-G RAM G

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Play field
0.6%
OF COST SPENT
₹93,251 spent
of ₹1.61 Cr sanctioned
₹1.60 Cr still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹1.61 Cr
Pure scheme (wage + material)
Expenditure since inception
₹93,251
0.6% of sanction
Balance cost (unspent)
₹1.60 Cr
Wage₹84.94 L
Material₹74.82 L
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type