Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
0.5%
OF COST SPENT
₹1.07 L spent
of ₹1.95 Cr sanctioned
₹1.94 Cr still to spend
on 53 ongoing works
Works ongoing
53
Open the list of these works →
Sanctioned
₹1.95 Cr
Pure scheme (wage + material)
Expenditure since inception
₹1.07 L
0.5% of sanction
Balance cost (unspent)
₹1.94 Cr
Wage₹75.16 L
Material₹1.19 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Narmadapuram — Hoshangabad ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By new work type

Amounts in ₹ Crore