Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
14.1%
OF COST SPENT
₹3.07 Cr spent
of ₹21.81 Cr sanctioned
₹18.73 Cr still to spend
on 531 ongoing works
Works ongoing
531
Open the list of these works →
Sanctioned
₹21.81 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.07 Cr
14.1% of sanction
Balance cost (unspent)
₹18.73 Cr
Wage₹6.04 Cr
Material₹12.69 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore