Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGFarm Pond
0.3%
OF COST SPENT
₹5.55 L spent
of ₹19.17 Cr sanctioned
₹19.12 Cr still to spend
on 675 ongoing works
Works ongoing
675
Open the list of these works →
Sanctioned
₹19.17 Cr
Pure scheme (wage + material)
Expenditure since inception
₹5.55 L
0.3% of sanction
Balance cost (unspent)
₹19.12 Cr
Wage₹15.25 Cr
Material₹3.87 Cr