Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAConstruction of Well
53%
OF COST SPENT
₹3.84 Cr spent
of ₹7.23 Cr sanctioned
₹3.40 Cr still to spend
on 249 ongoing works
Works ongoing
249
Open the list of these works →
Sanctioned
₹7.23 Cr
Pure scheme (wage + material)
Expenditure since inception
₹3.84 Cr
53% of sanction
Balance cost (unspent)
₹3.40 Cr
Wage₹90.60 L
Material₹2.49 Cr
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh