Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Percolation Tank
45.9%
OF COST SPENT
₹4.68 Cr spent
of ₹10.21 Cr sanctioned
₹5.53 Cr still to spend
on 283 ongoing works
Works ongoing
283
Open the list of these works →
Sanctioned
₹10.21 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.68 Cr
45.9% of sanction
Balance cost (unspent)
₹5.53 Cr
Wage₹3.86 Cr
Material₹1.66 Cr
Trend · statewide

—
—
Slowest spending this quarter · worth a look
Rewa — Gangev −₹42.23 L
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore