Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGAFarm Pond
25.5%
OF COST SPENT
₹48.69 L spent
of ₹1.91 Cr sanctioned
₹1.42 Cr still to spend
on 93 ongoing works
Works ongoing
93
Open the list of these works →
Sanctioned
₹1.91 Cr
Pure scheme (wage + material)
Expenditure since inception
₹48.69 L
25.5% of sanction
Balance cost (unspent)
₹1.42 Cr
Wage₹1.00 Cr
Material₹41.88 L
Trend · statewide

—
—
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP