Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

MGNREGA + VBGRAMGConstruction of Tank
48.9%
OF COST SPENT
₹9.87 Cr spent
of ₹20.18 Cr sanctioned
₹10.32 Cr still to spend
on 244 ongoing works
Works ongoing
244
Open the list of these works →
Sanctioned
₹20.18 Cr
Pure scheme (wage + material)
Expenditure since inception
₹9.87 Cr
48.9% of sanction
Balance cost (unspent)
₹10.32 Cr
Wage₹7.17 Cr
Material₹3.15 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
Sidhi — Sihawal −₹1.52 Cr
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By block

Amounts in ₹ Crore