Ongoing works

Works in progress: what they cost, what has been spent, and how fast spending is moving.

VBGRAMGConstruction of Check Dam/Stop Dam
2.7%
OF COST SPENT
₹4.04 L spent
of ₹1.52 Cr sanctioned
₹1.48 Cr still to spend
on 22 ongoing works
Works ongoing
22
Open the list of these works →
Sanctioned
₹1.52 Cr
Pure scheme (wage + material)
Expenditure since inception
₹4.04 L
2.7% of sanction
Balance cost (unspent)
₹1.48 Cr
Wage₹45.67 L
Material₹1.02 Cr
Trend · statewide

—
—
Slowest spending this week · worth a look
NARMADAPURAM — HOSHANGABAD ₹0
Top 10 new work types

Ranked by sanctioned cost

Breakdown

By GP

Amounts in ₹ Lakh